Search
#{_Lt}#{ImageTag} class="listItem-img listItem-img_autocomplete" src="#{ImageSrc}" alt="#{ImageAlt}" width="#{ImageWidth}" height="#{ImageHeight}" /#{_Gt}
#{Category}

#{Title}

#{Copy}

Read more about #{Title}

Specialist & Critical Care Centre

Facts

Location Client Cost Size Completion
Llanfrechfa Grange, Cwmbran Aneurin Bevan Health Board £195m 55,000m2 Due Spring 2021

Project details

The hospital is the centrepiece of a new model of healthcare delivery serving over 600,000 people and will deal with all major emergencies as well as treat and care for those needing complex emergency or critical care. It will have 471 beds and be home to more than 40 specialist services with a helicopter pad for patients who need to arrive by air ambulance.  

Careful modelling of staff and patient flows in the design phase allows early streaming to a point of care and access to timely and expert care;  this is supported by dedicated circulation systems for front of house and back of house services enhancing patient privacy. 

The hospital is designed to be flexible, adaptable and expandable. The use of universal rooms allows operational flexibility and blurring of departmental boundaries to deal with changing demand. 

It takes advantage of the landscaping setting, offering views across the surrounding countryside and access to therapeutic spaces to promote healing and wellness. The workplace also offers a highly connected environment with high quality staff spaces to attract and retain the best workforce.

The building has been designed to level 2 BIM and maximises the use of digital technology through the supply chain. Off-site manufactured components will be installedon site to enable programme efficiencies, offer improved health and safety and maximise quality control.

It will help us to create a much improved care environment, timely access to emergency care and ensure patients get the best outcomes from their care.

Judith Paget, Chief Executive Aneurin Bevan University Health Board

Brief

  • New model of care to centralise specialist and critical care services 
  • High quality and efficient clinical environment 
  • Evidence based design principals 
  • BREEAM Excellent 

Results

  • Evidence based clinical environment
  • Flexibility for service delivery 
  • Highest quality patient environment 
  • Digitial engineering - BIM Level 2 project

Integrated services

masterplanning, architecture, interior design, clinical planning, planning consultant, landscape architecture

/globalassets/projects/specialist--critical-care-centre/sccc-web4.jpg

Laing O’Rourke brings engineering expertise, innovation in healthcare construction, a committed and energised team and an absolute focus on delivery certainty.

Ray O’Rourke