Search
#{_Lt}#{ImageTag} class="listItem-img listItem-img_autocomplete" src="#{ImageSrc}" alt="#{ImageAlt}" width="#{ImageWidth}" height="#{ImageHeight}" /#{_Gt}
#{CategoryPrefix}#{Category}

#{Title}

#{Author}

#{Copy}

Read more about #{Title}

Brunel Learning and Teaching Centre

Facts

Location Client Cost Completion
London, UK Brunel University £50m 2021

Project details

Brunel LTC is a contemporary seven storey facility that replaces the 1968 John Crank building on the university’s main campus. It provides flexible team-based learning and teaching spaces, arranged around a central atrium and living stair. The design benefits from a mixed mode ventilation approach, an optimised facade, ground source heat pumps and a roof mounted PV array.

Integrated services

civil and structural engineering, building services engineering, lighting