#{Title}
#{Copy}
Location | Client | Cost | Completion |
---|---|---|---|
Galway, Ireland | Galway Racecourse | €17m | 2007 |
This 6000m2 new stand for Galway racecourse was completed on time for the 2007 summer race season.
The main circulation and viewing areas are largely naturally ventilated, minimising energy consumption while providing a comfortable internal environment. Monitoring of the space temperatures during the race week has demonstrated that the strategy was highly successful in maintaining comfortable air temperatures despite the large internal gains and solar gains from the south facing glazing that opens onto the race track.
environmental engineering, sustainability