#{Title}
#{Copy}
Location | Client | Cost | Completion |
---|---|---|---|
Co. Roscommon, Ireland | HSE West | €0.6m | 2002 |
The project involved the adding of air conditioning and medical gases to the existing operating department, along with associated works, which included structural assessment of existing roof for new plant and theatre pendants, adding of new false ceilings to conceal new services and general other upgrade works to improve the quality of the facilities.
The existing Operating Department contains two operating theatres with shared support facilities. It was required that at least one operating theatre be available at all times for use throughout the construction of the project.
There was also a requirement to install temporary air pressurisation during the works to protect the active areas of the Theatre Department against the risk of Aspergillosis from external works associated with another nearby construction project.
Images only for illustration purposes
architecture, environmental engineering,structural engineering, quantity surveyor