#{Title}
#{Copy}
Location | Client | Cost | Completion | Awards |
---|---|---|---|---|
Holbeck, Leeds, UK | CTP St James | £18m phase one | 2004 phase one | 10 |
New life for a major heritage site.
We kept the existing street pattern but enhanced the close-grained fabric of the block with a series of courtyards linked by separate pedestrian and vehicular routes.
We repaired and converted the existing structures for a range of residential and commercial uses.
The aesthetic of the area was preserved while boosting floor space with carefully balanced new infill buildings that varied between two and six storeys.
architecture, landscape architecture, acoustics, lighting