#{Title}
#{Copy}
Location | Client | Cost | Completion | Awards |
---|---|---|---|---|
Lincoln, UK | Wigford | £14m | 2007 | 2 |
Existing concrete cladding panels have been removed and the building is now entirely re-clad in high quality, low maintenance materials.
The emphasis has been on quality throughout. Detailed modelling of balconies and roof canopies have been composed to lighten the appearance of what was a dreary, monolithic structure, while shifting the unrelieved symmetry of the existing facades.